Our BIM systems calculate precise material quantities, reducing waste by approximately 20%, while 4D scheduling visually demonstrates the construction sequence to clients and tradespeople. For client presentations and planning applications, we produce photorealistic 3D renderings through Lumion software, complete with virtual reality walkthroughs that enable clients to experience their future spaces and make informed decisions about materials and layouts.

Our Working Process at Tenarts

Tenarts Building Ltd employs state-of-the-art 3D laser scanning technology for all bespoke carpentry and structural projects. Our Leica BLK360 laser scanners capture room dimensions with 0.1mm accuracy, creating detailed point-cloud models that eliminate measurement errors in complex spaces. This technology ensures perfect component fitting for wardrobes, kitchens, and architectural elements. For larger projects, we implement Building Information Modeling (BIM) using Autodesk Revit software, which allows for advanced clash detection before construction begins.

Building Information Modeling (BIM) Implementation

Our BIM workflow represents the gold standard in construction planning. Using Autodesk Revit software, we create intelligent 3D models that integrate architectural, structural, and MEP systems in a coordinated digital environment. The BIM process begins with our laser scan data being converted into a parametric model where every component contains detailed information about its materials, dimensions, and performance characteristics. Our clash detection algorithms automatically identify potential conflicts between systems before construction begins, typically resolving 90% of coordination issues in the virtual environment. The model serves as a living document throughout the project, updated in real-time with as-built information and accessible to all stakeholders through our cloud-based collaboration platform.

Location

address
2972 Westheimer Rd. Santa Ana, Illinois 85486
Key transport

Coast
300m

University
750m

Supermarket
500m

Park
1120m

Railway station
1750m

Airport
3158m

Bus station
450m

Bank
415m

Hospital
350m

Request more information